Would you like to sign out?

    Buckling Assessment on Steel Bridge Flyover

    midasBridge TeamMarch 24, 2021

    Please fill out the Download Section (Click here) below the Comment Section to download the Project Application


     

     

    Background

     

    In 2016, Kolkata witnessed a major steel bridge failure of the Vivekananda Road Flyover during construction which led to 27 deaths and 50 injured. The construction work of a 2.2km flyover began in 2009 and was expected to be completed in 2010. Although six years behind schedule, it was not yet completed the erection part till 2016 (Figure 1).