Webinar
Ongoing Registration In Progress Closed
Smarter, Simpler, Faster:
The Optimized NR Bridge Assessment Workflow
   
Day 1 - Nov 26th, 2025 (Wed)
Day 2 - Nov 27th, 2025 (Thu)
🕑 13:00 – 16:20 (BST)
Overview

Experience how automation transforms your NR Bridge assessment workflow.

 

You’ve probably seen how technology has transformed the way we work from manual drafting to automated analysis, from spreadsheets to smart reporting.

 

Yet, Network Rail bridge assessment has long remained a manual and time-consuming process.

Civil NX took on that challenge and made automation possible.

 

In this webinar, we’ll showcase how the new automation features in Civil NX streamline

NR bridge assessments, ensure full compliance, and deliver real efficiency gains across your workflow.

 

Registered participants will be provided with a 3-week full license trial of Civil NX, to experience these features firsthand.


Register now →
Who Should Attend

Railway Bridge Engineers

Involved in Network Rail bridge assessment, inspection, or rehabilitation projects.

 

Design Consultants & Structural Engineers

Working on steel or composite railway bridge design aligned with NR/GN/CIV/025 standards.

 

Infrastructure Engineers & Project Managers

Seeking to automate NR compliance workflows and improve project delivery efficiency.

Learning Objectives

1️⃣ Practical insights from expert presentations
Discover practical strategies and proven methodologies as leading firms share design know-how and lessons from complex infrastructure projects.

2️⃣ Expert case studies from industry leaders
Gain exclusive insights as Arcadis engineers showcase their experience on the HS2 high-speed rail project, while AtkinsRéalis and Mott MacDonald present best practices and innovative approaches from their major design works.

3️⃣ Experience how easily NR projects can be delivered
See how simple and efficient NR bridge assessment can be with the latest Civil NX updates including NR/GN/CIV/025 compliance, API-based automation, and enhanced solver performance through an exclusive demo session.

Details of Webinar
  • Speaker_Henry Still (200200)-1
    Henry Still Bridge Engineer | AtkinsRéalis | Day 1

    Henry Still, a bridge engineer with 5 years of experience, has worked on major projects in Wales and Ireland across all phases from tender to construction. Specializing in complex structural analysis and staged construction design, he will present a case study on how staged analysis with Midas supported both bridge design and execution.

  • Speaker_Dr Vidya Sagar Thammandra (200200)-2
    Dr Vidyasagar Thammandra Associate Technical Director | Arcadis UK | Day 1

    Dr. Vidyasagar Thammandra, a Chartered Structural Engineer with 25+ years of experience, has led major projects across rail, highways, and energy. His work spans HS2 Curzon Street viaducts, Woking underbridge, and concept designs for Clapham Junction footbridge. His interests focus on advanced structural assessment, design automation, and optimization.

  • Speaker_Alex Fowler (200200)-2
    Alex Fowler Principal Bridges Engineer | Arcadis | Day 2

    Alex, a Chartered Civil Engineer with 12 years’ experience in Civil and Rail, has contributed to many of the UK’s major projects, including HS2, Transpennine Route Upgrade, Crossrail, and Hinkley Point C. Alongside project delivery, he is Digital Lead within Arcadis’ Rail North business, driving the use of emerging technology to enhance technical capability and project outcomes.

  • Alexander Griffiths
    Alexander Griffiths Principal Bridge Engineer | Mott MacDonald | Day 2

    Alexander, a Chartered Civil Engineer with 10+ years of experience, has led major bridge and civil structure projects across the UK, including heritage refurbishments and large-scale replacements. His recent work includes the Clifton Rail Bridge Replacement, covering both concept and detailed design. He specializes in advanced analysis, digital design, and interdisciplinary coordination, and is Practice Manager for Bridge and Civil Structures at Mott MacDonald.

  • Speaker_Manoj Kheterpal (200200)-1
    Manoj Kheterpal Technical/Business Development Manager | MIDAS IT UK | Day 1, 2

    Manoj, with a Master’s from IIT Guwahati, has 2.5+ years of experience on bridge projects including Network Arch, Cable-Stayed, Box Culverts, and Metro structures. At Midas, he focuses on training, API feature development, and technical support. He has worked with engineers in Hong Kong, Malaysia, Europe, and the UK, with recent efforts centered on supporting UK and European teams.

November 26
  • 13:00 - 13:10

    Opening Remarks & Agenda Briefing Roy Han | MIDAS IT

  • 13:10 - 14:10

    Project Application - Concrete Post tensioned balance cantilever Henry Still | AtkinsRéalis

  • 14:10 - 15:10

    HS2 Curzon St station Detailed design Dr Vidyasagar Thammandra | Arcadis UK

  • 15:10 - 16:10

    Latest Updates with Civil NX (NR/CIV/025, APIs and Solver) Manoj Kheterpal | MIDAS IT

  • 16:10 - 16:20

    Closing Remarks Roy Han | MIDAS IT

November 27
  • 13:00 - 13:10

    Opening Remarks & Agenda Briefing Roy Han | MIDAS IT

  • 13:10 - 14:10

    Integrating Workflows to Drive Sustainability Alex Fowler | Arcadis

  • 14:10 - 15:10

    Replacing Clifton Bridge Near Penrith Alexander Griffiths | Mott MacDonald

  • 15:10 - 16:10

    Latest Updates with Civil NX (NR/CIV/025, APIs and Solver) Manoj Kheterpal | MIDAS IT

  • 16:10 - 16:20

    Closing Remarks Roy Han | MIDAS IT

🎁 Special Benefits for Attendees

  • CIVIL NX 3 Weeks Trial Full Ver. License will be provided right after you register
  • Certificate of Completion Submit a 5-minutes easy assignment and get a PDF Certificate of Completion
    🔗 Assignment Submission Form
  • Project Applications Materials Access to presentation materials for all participants
  • CPD Point Certificate 4 hours of CPD Point Certificate