Webinar
Ongoing Registration In Progress Closed
Smarter, Simpler, Faster:
The Optimized NR Bridge Assessment Workflow
   
Day 1 - Nov 26th, 2025 (Wed)
Day 2 - Nov 27th, 2025 (Thu)
📍Live Streaming on GoToWebinar
🕑 13:00 – 16:20 (BST)
Webinar Overview

Learn directly from experts at AtkinsRéalis, Arcadis, and Mott MacDonald on how they use the latest CIVIL NX updates for Network Rail assessments. This webinar is ideal for railway bridge engineers and design/structural consultants working on Network Rail steel or composite bridge projects. While technology has moved us from manual drafting to automated analysis and from spreadsheets to smart reporting, NR bridge assessment has often remained manual and time-consuming. CIVIL NX set out to solve this challenge with automation.

 

In this webinar, you'll  see how CIVIL NX’s new automation features streamline NR bridge assessments, ensure full compliance, and deliver real efficiency gains across your workflow.

 

Register and experience how automation can transform your NR bridge assessment workflow.


Register now →
Learning Objectives

1️⃣ Expert case studies from industry leaders
Gain exclusive insights as Arcadis engineers share their experience from the HS2 high-speed rail project, while AtkinsRéalis and Mott MacDonald present best practices and innovative approaches from their major rail and bridge design projects.

2️⃣ Learn the latest all-in-one updates in CIVIL NX
Discover how CIVIL NX brings NR bridge assessment into a single, efficient workflow from modelling to checks and reporting. Through a detailed walkthrough and live demo, you’ll see how integrated tools and automation help you work faster and more consistently in one platform.

3️⃣ Experience how easily NR projects can be delivered
Use the free Civil NX trial license to experience for yourself how simple and efficient NR bridge assessment can be with the latest updates including NR/GN/CIV/025 compliance, API-based automation, and enhanced solver performance.

Speakers

Speaker_Henry Still (200200)-1
Henry Still
Bridge Engineer | AtkinsRéalis | Day 1
Henry Still, a bridge engineer with 5 years of experience, has worked on major projects in Wales and Ireland across all phases from tender to construction. Specializing in complex structural analysis and staged construction design, he will present a case study on how staged analysis with Midas supported both bridge design and execution.
Speaker_Dr Vidya Sagar Thammandra (200200)-2
Dr. Vidyasagar Thammandra
Associate Technical Director | Arcadis UK | Day 1
Dr. Vidyasagar Thammandra, a Chartered Structural Engineer with 25+ years of experience, has led major projects across rail, highways, and energy. His work spans HS2 Curzon Street viaducts, Woking underbridge, and concept designs for Clapham Junction footbridge. His interests focus on advanced structural assessment, design automation, and optimization.
Speaker_Alex Fowler (200200)-2
Alex Fowler
Principal Bridges Engineer | Arcadis | Day 2
Alex, a Chartered Civil Engineer with 12 years’ experience in Civil and Rail, has contributed to many of the UK’s major projects, including HS2, Transpennine Route Upgrade, Crossrail, and Hinkley Point C. Alongside project delivery, he is Digital Lead within Arcadis’ Rail North business, driving the use of emerging technology to enhance technical capability and project outcomes.
Speaker_Alexander Griffiths (200200)-1
Alexander Griffiths
Principal Bridge Engineer | Mott MacDonald | Day 2
Alexander, a Chartered Civil Engineer with 10+ years of experience, has led major bridge and civil structure projects across the UK, including heritage refurbishments and large-scale replacements. His recent work includes the Clifton Rail Bridge Replacement, covering both concept and detailed design. He specializes in advanced analysis, digital design, and interdisciplinary coordination, and is Practice Manager for Bridge and Civil Structures at Mott MacDonald.
Speaker_Manoj Kheterpal (200200)-1
Manoj Kheterpal
Technical/Business Development Manager | MIDAS IT UK | Day 1, 2
Manoj, with a Master’s from IIT Guwahati, has 2.5+ years of experience on bridge projects including Network Arch, Cable-Stayed, Box Culverts, and Metro structures. At Midas, he focuses on training, API feature development, and technical support. He has worked with engineers in Hong Kong, Malaysia, Europe, and the UK, with recent efforts centered on supporting UK and European teams.
Agenda
  • 13:00 - 13:10

    Opening Remarks & Agenda Briefing Roy Han | MIDAS IT

  • 13:10 - 14:10

    Project Application - Concrete Post tensioned balance cantilever Henry Still | AtkinsRéalis

  • 14:10 - 15:10

    HS2 Curzon St station Detailed design Dr Vidyasagar Thammandra | Arcadis UK

  • 15:10 - 16:10

    Latest Updates with CIVIL NX (NR/CIV/025, APIs and Solver) Manoj Kheterpal | MIDAS IT

  • 16:10 - 16:20

    Closing Remarks Roy Han | MIDAS IT

  • * Each session consists of a 50-minute lecture and a 10-minute Q&A

  • 13:00 - 13:10

    Opening Remarks & Agenda Briefing Roy Han | MIDAS IT

  • 13:10 - 14:10

    Integrating Workflows to Drive Sustainability Alex Fowler | Arcadis

  • 14:10 - 15:10

    Replacing Clifton Bridge Near Penrith Alexander Griffiths | Mott MacDonald

  • 15:10 - 16:10

    Latest Updates with CIVIL NX (NR/CIV/025, APIs and Solver) Manoj Kheterpal | MIDAS IT

  • 16:10 - 16:20

    Closing Remarks Roy Han | MIDAS IT

  • * Each session consists of a 50-minute lecture and a 10-minute Q&A

🎁 Special Benefits for Attendees

  • CIVIL NX Trial (Until Nov 30) Experience how CIVIL NX simplifies Network Rail assessment with a full trial license valid until November 30. The trial starts as soon as you register, so the earlier you register, the longer you can use it.
  • CPD Point Certificate -4 hours of CPD Point Certificate for participants
    -Certificate of Completion for those who submit an assignment
    -After registration, the assignment guide and sample file will be sent via confirmation email.
  • Free Webinar Materials Access to presentation materials for all participants

UK NR DL BN

 

 

FAQ

Where can I get the Assignment Materials?

After you register, a download link for the private license code and assignment materials will be send via confirmation mail.

When is the assignment due date and how to submit it?

It's due November 30, and you can easily submit it via the link below.

 

🔗Submission Link

What's the benefit of doing assignment?

You’ll receive an official Certificate of Completion from MIDAS as a PDF. You’ll also experience for yourself how simple and efficient NR bridge assessment can be.