Fill out the form to keep watching
Having trouble viewing the video?
Some regions or networks may restrict Vimeo playback.
Confined masonry was first used in the reconstruction after the 1908 Messina earthquake and is still built in seismic regions around the world. This recording covers it from the start: construction basics, planning and detailing, design approaches including the simplified method in Eurocode 8, and the places where codes still fall short.
Your submission has been
successfully received
If you meet the certification criteria,
Your Certificate of Completion will be sent to your email.
If you need urgent support, contact us via
here.
We truly appreciate your participation!
Open Access Has Ended
The open access period has ended.
If you have a MIDAS account, sign in
and complete the access form to watch this session.
Full access is one step away 👀
Complete a short form to continue
Description
A confined masonry project usually reaches you as three separate questions. The site team asks how the wall should meet the tie column. The designer asks whether the building needs a numerical model at all. The reviewer asks what the code actually requires. Each one tends to be answered from a different document, and the answers rarely line up.
In this session, one number ties them together. For many buildings the designer’s answer comes down to the Wall Index, and that same number tells the site team how much wall to build and the reviewer what to check. When a building falls outside that shortcut, you see which numerical model takes over, and where the code stops giving answers.
Key Takeaways
📌 What Sets Confined Masonry Apart From an RC Frame With Infill?
Construction sequence, load path, and the four details that decide seismic performance: masonry units, tie column detailing, openings, and toothing.
📌 Which Design Approach Fits Your Building?
The simplified method based on Wall Index, as included in Eurocode 8, and when a project needs an Equivalent Frame, Strut and Tie, or Equivalent Truss model.
📌 Where Is Confined Masonry Still Built Without a Code?
Current gaps in codes and guidelines, and what it takes to close them.
Good To Know
Why does Wall Index work?
Seismic force is shared among shear walls in proportion to their cross sectional area, so wall area over floor area tracks demand. The higher the hazard and the more storeys, the higher the required value.
Does the simplified method only apply in Eurocode countries?
No. It appears in Eurocode 8, the Indian code, and the Mexican code. Only the seismic coefficient changes by country.
Benefit
→ Will receive email by submitting survey
→ Will receive email by submitting survey
Speaker