Main features used in Fuling Wujiang Bridge
- DFX import for spiral continuous curved bridge generation
- Construction stage analysis
- Moving load analysis
Project Information
- Owner
- -
- General Contractor
- -
- Engineering Consultant
- T.Y. LIN INTERNATIONAL GROUP
- Construction Period
- 2005 - 2009
- Type of Project
- Cable-stayed Bridge
- Size of Structure
- 340m Main Span, 590m Total Length
- Location
- Chongqing, China
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Panorama
The bridge is the largest of several big bridges along the G69 Yinbai expressway that runs between Fuling and Fengdu along the east side of the Yangtze River.
Located 6km upstream of the confluence of the Wujiang and Yangtze Rivers, the crossing is most notable for the double plane A-frame pylons which stand 204.8m tall on the Fuling side and 200m tall on the Fengdu side.
The four-lane deck has a length of 630m with a configuration of (52 + 105 + 320 + 105 + 48)m.
The deck is approximately 120m to the full reservoir formed by the 3 gorges dam or approximately 150m to the original level of the Wujiang River.
Project Contact
- Engineering Consultant
- T.Y. LIN INTERNATIONAL GROUP
- Address
- 6 Furong Lu, Renhe, Yubei District Chongqing 401121, China
- Introduction
- T. Y. Lin International is a global, multi-disciplinary infrastructure services firm, Headquartered in San Francisco. The firm provides a range of planning, design, construction and project management services to the aviation, bridge, facilities, mobility, planning, and management, ports and marine, rail and transit, and surface transportation industries. They operates from more than 50 regional centers across four continents.
- Website
- https://www.tylin.com
- rengl@tylin.com.cn