Would you like to sign out?

    Aramchan Bridge

    Sejong, Korea

    Main features used in Aramchan Bridge
    • Seismic analysis
    • Construction stage analysis with transverse model
    • Detail analysis with finite elements
    Project Information
    Owner
    Korea Land and Housing Corporation
    General Contractor
    SK E&C
    Architect
    -
    Engineering Consultant
    SAMBO Engineering
    Construction Period
    2011 – 2015
    Type of Project
    Cable-stayed Bridge
    Size of Structure
    250m Main Span, 840m Total Length
    Location
    Sejong, Korea
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Construction
    • Panorama

    Aramchan bridge is the first open-type high-altitude pylon cable-stayed bridge in South Korea that designed and built the pylon in U shape to connect the pylon in 114m long with the curse tower (83m) asymmetrically and maximize beauty and River’s safety.

    Project Contact
    Engineering Consultant
    SAMBO Engineering
    Address
    SAMBO Engineering
    Introduction
    Sambo Engineering & Construction Company provides construction and civil engineering services internationally. The company specializes in foundation engineering including grouting and boring.
    Website
    http://www.samboeng.co.kr/
    Email
    -