Main features used in Bahia Honda Bridge
- Rail-structure interaction analysis
- Stability analysis
Project Information
- Owner
- Florida Department of Environmental Protection
- General Contractor
- -
- Engineering Consultant
- GPI
- Construction Period
- Reconstructed in 1976
- Type of Project
- Truss Girder Bridge
- Size of Structure
- 57m Main Span, 1.5km Total Length
- Location
- Florida, USA
- Used Product
- MIDAS CIVIL
- Modeling
- Drawing/Report
- Key Part
The truss span inspection of the bridge before doing the restoration of itself, was done by FIT
Engineering on June 2016. For the piers and abutment part, UESI performed the professional
inspection on November 2016. The bridge was mainly reviewed of the reduced section
properties and unsafety for pedestrian loads.
Project Contact
- Engineering Consultant
- GPI
- Address
- RED BANK OFFICE 54 Shrewsbury Avenue, Suite A Red Bank, NJ 07701, USA
- Introduction
- GPI has been consistently ranked in Engineering News Record’s Top Design Firms. With a staff of over 1,200 professionals including engineers, planners, scientists,technicians, drafts persons, and inspectors, GPI provides expert services in a wide range of disciplines.
- Website
- https://www.gpinet.com
- -