Main features used in Byker Viaduct
- Construction stages analysis with post tensioning considering creep and shrinkage
- Moving load analysis
Project Information
- Owner
- -
- General Contractor
- John Mowlem & Co., Ltd.
- Engineering Consultant
- WSP | Parsons Brinckerhoff
- Construction Period
- 1976 - 1979
- Type of Project
- Balanced Cantilever PSC Box Girder Bridge
- Size of Structure
- 815m Total Length
- Location
- London, UK
- Used Product
- MIDAS CIVIL
- Sketch
- Modeling
- Result
The assessment of the Byker Viaduct is completed using a three-dimensional line model in. The viaduct is drawn up in AutoCAD and imported to midas Civil due to the complex geometry which saves a lot of time in creating the model. The bearings are modeled as elastic links which provide simple results extraction to check the bearing schedule. The load inputs for permanent and live loads are straightforward due to the intuitive menu. The way the program output results provide simple extraction of required data.
Project Contact
- Engineering Consultant
- WSP | Parsons Brinckerhoff
- Address
- Kings Orchard 1 Queen Street Bristol Avon BS2 0HQ, UK
- Introduction
- Parsons Brinckerhoff is one of the world's leading engineering professionalconsulting firms. Their expertise ranges from environmental remediation to urbanplanning, from engineering iconic buildings to designing sustainable transportnetworks, and from developing the energy sources of the future.
- Website
- https://www.wsp-pb.com
- -