Main features used in Caiyuanba Bridge
- Construction stage analysis
- Moving load analysis
- Response spectrum analysis
Project Information
- Owner
- Chongqing City Investment Company
- General Contractor
- China Chungtie Major Bridge Engineering Group
- Engineering Consultant
- T.Y. LIN INTERNATIONAL GROUP / Chongqing Communication Research Institute
- Construction Period
- Completed in 2007
- Type of Project
- Steel Half-through Arch Bridge
- Size of Structure
- 420m Main Span, 800m Total Length
- Location
- Chongqing, China
- Used Product
- Midas Civil
- Modeling
- Result
Crossing over the Yangtze River, the Caiyuanba Bridge connects two of Chongqing’s business
districts as one of the transportation backbones for this rapidly expanding and congested
city. The double level bridge, with a main span of 420m, carries six lanes of highway and two
pedestrian walkways on its upper deck, and two dedicated tracks of monorails on its lower
deck for Chongqing Light Rail Line 3.
Project Contact
- Engineering Consultant
- T.Y. LIN INTERNATIONAL GROUP
- Address
- 6 Furong Lu, Renhe, Yubei District Chongqing 401121, China
- Introduction
- T. Y. Lin International is a global, multi-disciplinary infrastructure services firm, Headquartered in San Francisco. The firm provides a range of planning, design, construction and project management services to the aviation, bridge, facilities, mobility, planning, and management, ports and marine, rail and transit, and surface transportation industries.
- Website
- https://www.tylin.com
- rengl@tylin.com.cn