Main features used in Connel Bridge
- Linear static and moving load analysis
- Buckling analysis
Project Information
- Owner
- Transport Scotland
- General Contractor
- Arrol’s Bridge and Roof Company
- Engineering Consultant
- Jacobs UK
- Construction Period
- -
- Type of Project
- Steel Truss Bridge
- Size of Structure
- 224m Total Length
- Location
- Argyll and Bute, Scotland
- Used Product
- MIDAS CIVIL
- Modeling
- Panorama
This bridge is originally constructed in 1903 for rail traffic. It carries the A828 road over Loch Etive. 224m long riveted steel truss structure consists of two 77m cantilever sections supporting a 70m suspended through truss span. Composite steel and concrete deck for road traffic is installed in two phases, in 1957 and 1967.
Project Contact
- Engineering Consultant
- Jacobs UK
- Address
- 95 Bothwell Street, Glasgow, Scotland G2 7HX, UK
- Introduction
- Jacobs has offices in 230+ locations around the world serve a broad range of companies including industrial, commercial, and government clients. Also, They provide professional and construction services, including all aspects of architecture, engineering, and construction, operations and maintenance, as well as scientific and specialty consulting.
- Website
- https://www.jacobs.com
- Javier.Lancho@jacobs.com