Main features used in Foshan Dongping Bridge
- Construction stage analysis
- Moving load analysis
- Response spectrum analysis
Project Information
- Owner
- Foshan Gongyong Career Management Bureau
- General Contractor
- -
- Engineering Consultant
- Sichuan highway design and research institute
- Construction Period
- Completed in 2006
- Type of Project
- Steel Arch Bridge
- Size of Structure
- 300m Main Span, 1.4km Total Length
- Location
- Foshan, China
- Used Product
- MIDAS CIVIL
- Modeling
- Result
Foshan Dongping Bridge length of 1,427m, the largest three-span rib arch structure, was completed in September 2006. Its seven technologies was awarded in "China Enterprise New Record Prize", "China Zhan Tianyou Civil Engineering Award" and "2009 National Quality Engineering, silver medal".
Project Contact
- Engineering Consultant
- Sichuan highway design and research institute
- Address
- 1#, Wuhou Hen Jie St. Chengdu, China
- Introduction
- Sichuan highway design and research institute (SCHDRI) was found at 1953, which is a comprehensive top class institute focusing on highway design and research with consult certificate of survey, design, inspection, consulting, construction administration and environmental assessment etc. There are 1500 employees work for the institute, including a national level designer, 6 provincial level designers and 22 experts
- Website
- https://www.schdri.com.cn
- -