Main features used in Freeway D47, Section 8
- Construction stage analysis with composite action
- Wet concrete load & mobile formwork simulation
- Steel box girder design as per Eurocode
Project Information
- Owner
- -
- General Contractor
- -
- Engineering Consultant
- Strasky, Husty and Partners
- Construction Period
- Completed in 2007
- Type of Project
- Steel Composite Girder Bridge
- Size of Structure
- 102m Main Span, 402m Total Length
- Location
- Opava, Czech Republic
- Used Product
- MIDAS CIVIL
- Result
- Drawing/Report
- Panorama
The twin bridge, with a total length of 402m and spans from 49.7 to 102.6m, has a deck formed by box girders assembled from steel sections and a composite deck slab. The girder is supported by a single support in the bridge axis, and it is fixed in torsion at the abutments. The steel structure was erected in a progressive cantilever from one abutment to another.
Project Contact
- Engineering Consultant
- Strasky, Husty and Partners
- Address
- Sumavska 524/31, 602 00 Brno, Czech Republic
- Introduction
- It assists clients in the design and construction of a wide range of bridge and motorway structures, from pedestrian bridges to multi-lane long-span structures, and unique or special designs for landmark structures. Their experience includes cable-suspension and cable-stayed bridges, precast and cast-in-place segmental concrete and arch bridges.
- Website
- https://www.shp.eu
- shp@shp.eu