    Freeway D47, Section 9

    Ostrava, Czech Republic

    Main features used in Freeway D47, Section 9
    • Static and strength analysis of the combined cable-stayed road bridge
    • Prestressed concrete design as per Eurocode
    Project Information
    Owner
    Road and Motorway Directorate of CR
    General Contractor
    Skanska
    Architect
    -
    Engineering Consultant
    Strasky, Husty and Partners
    Construction Period
    2004 - 2007
    Type of Project
    Cable-stayed Bridge
    Size of Structure
    105m Main Span, 605m Total Length
    Location
    Ostrava, Czech Republic
    Used Product
    MIDAS CIVIL
    • Modeling
    • Panorama

    The twin bridge, with a total length of 605m, has 14 spans with length from 21.5 to 105m. Each bridge is formed by a two-cell box girder. In the main and two adjacent spans, the girders are mutually connected by top slab and individual struts, and they are suspended on a single pylon situated in the bridge axis.

    Project Contact
    Engineering Consultant
    Strasky, Husty and Partners
    Address
    Sumavska 524/31, 602 00 Brno, Czech Republic
    Introduction
    It assists clients in the design and construction of a wide range of bridge and motorway structures, from pedestrian bridges to multi-lane long-span structures, and unique or special designs for landmark structures. Their experience includes cable-suspension and cable-stayed bridges, precast and cast-in-place segmental concrete and arch bridges.