Main features used in Freeway D47, Section 9
- Static and strength analysis of the combined cable-stayed road bridge
- Prestressed concrete design as per Eurocode
Project Information
- Owner
- Road and Motorway Directorate of CR
- General Contractor
- Skanska
- Engineering Consultant
- Strasky, Husty and Partners
- Construction Period
- 2004 - 2007
- Type of Project
- Cable-stayed Bridge
- Size of Structure
- 105m Main Span, 605m Total Length
- Location
- Ostrava, Czech Republic
- Used Product
- MIDAS CIVIL
- Modeling
- Panorama
The twin bridge, with a total length of 605m, has 14 spans with length from 21.5 to 105m. Each bridge is formed by a two-cell box girder. In the main and two adjacent spans, the girders are mutually connected by top slab and individual struts, and they are suspended on a single pylon situated in the bridge axis.
Project Contact
- Engineering Consultant
- Strasky, Husty and Partners
- Address
- Sumavska 524/31, 602 00 Brno, Czech Republic
- Introduction
- It assists clients in the design and construction of a wide range of bridge and motorway structures, from pedestrian bridges to multi-lane long-span structures, and unique or special designs for landmark structures. Their experience includes cable-suspension and cable-stayed bridges, precast and cast-in-place segmental concrete and arch bridges.
- Website
- https://www.shp.eu
- shp@shp.eu