    Architecture Greystone Footbridge

    Liverpool, UK

    Main features used in Greystone Footbridge
    • Construction staged analysis
    • Unknown load factor and lack of fit force for cable optimization
    • Dynamic analysis
    Project Information
    Owner
    Knowsley Council
    General Contractor
    Eric Wright Civil Engineering
    Architect
    -
    Engineering Consultant
    WSP | Parsons Brinckerhoff
    Construction Period
    Completed in 2015
    Type of Project
    Cable-stayed Bridge
    Size of Structure
    40m Main Span, 80m Total Span
    Location
    Liverpool, UK
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Construction

    The bridge has two 40m spans and the steel pylon of 23.5m fixed on the shaped solid reinforced concrete piers on the piles.

    Stayed cables are arranged in two inclined planes and the lower adjustable anchorages are located on the side of the deck.

    The deck is supported by fully locked cable-stays.

    Project Contact
    Engineering Consultant
    WSP | Parsons Brinckerhoff
    Address
    Kings Orchard 1 Queen Street Bristol Avon BS2 0HQ, UK
    Introduction
    Parsons Brinckerhoff is one of the world's leading engineering professional consulting firms. Their expertise ranges from environmental remediation to urban planning, from engineering iconic buildings to designing sustainable transport networks, and from developing the energy sources of the future.
    Website
    https://www.wsp-pb.com
    Email
    -