    Main features used in I-95 Bridge
    • Construction stage analysis with composite action
    • Moving load analysis with concurrent member forces
    • Section stiffness scale factor
    • Node local axis for skewed bridge
    Project Information
    Owner
    Connecticut Department of Transportation
    General Contractor
    -
    Architect
    -
    Engineering Consultant
    GM2 ASSOCIATES
    Construction Period
    Completed in 2013
    Type of Project
    Steel Plate Girder Bridge
    Size of Structure
    32m Main Span, 325m Total Length
    Location
    Connecticut, USA
    Used Product
    • Modeling
    • Result
    • Panorama

    This work includes reconstruction of an I-95 Bridge and construction of the new ramp S-1 bridge over Fulton Terrace. Welded steel plate girders are utilized to optimize girder spacing to coincide with the travel lanes. A three-stage construction of the I-95 Bridge is provided to maintain traffic in I-95 during the construction.

    Project Contact
    Engineering Consultant
    GM2 ASSOCIATES
    Address
    115 Glastonbury Blvd., Glastonbury, Connecticut 06033, USA
    Introduction
    GM2 Associates was founded in 1988 and GM2’s engineers are licensed to practice all across most of the east of USA. They maintain significant in-house capabilities, ranging from complex seismic analysis to survey, construction inspection, bridge, hydraulics and drainage, bridge safety inspection, roadway, traffic, buildings and site engineering.
    Website
    https://www.gm2inc.com
    Email
    -