Main features used in I-95 Bridge
- Construction stage analysis with composite action
- Moving load analysis with concurrent member forces
- Section stiffness scale factor
- Node local axis for skewed bridge
Project Information
- Owner
- Connecticut Department of Transportation
- General Contractor
- -
- Engineering Consultant
- GM2 ASSOCIATES
- Construction Period
- Completed in 2013
- Type of Project
- Steel Plate Girder Bridge
- Size of Structure
- 32m Main Span, 325m Total Length
- Location
- Connecticut, USA
- Used Product
- Modeling
- Result
- Panorama
This work includes reconstruction of an I-95 Bridge and construction of the new ramp S-1 bridge over Fulton Terrace. Welded steel plate girders are utilized to optimize girder spacing to coincide with the travel lanes. A three-stage construction of the I-95 Bridge is provided to maintain traffic in I-95 during the construction.
Project Contact
- Engineering Consultant
- GM2 ASSOCIATES
- Address
- 115 Glastonbury Blvd., Glastonbury, Connecticut 06033, USA
- Introduction
- GM2 Associates was founded in 1988 and GM2’s engineers are licensed to practice all across most of the east of USA. They maintain significant in-house capabilities, ranging from complex seismic analysis to survey, construction inspection, bridge, hydraulics and drainage, bridge safety inspection, roadway, traffic, buildings and site engineering.
- Website
- https://www.gm2inc.com
- -