- Construction stage analysis with time-dependent effects
- Cable tension optimization with geometric nonlinearity
- Moving load analysis with concurrent member forces
- Owner
- Incheon Bridge Corporation
- General Contractor
- Samsung Engineering & Construction
- Engineering Consultant
- Seoyoung Engineering / Chodai
- Construction Period
- 2005 - 2009
- Type of Project
- Cable-stayed Bridge
- Size of Structure
- 800m Main Span, 11.6km Total Length
- Location
- Incheon, Korea
- Used Product
- MIDAS CIVIL
- Result
- Panorama
ncheon Bridge is the longest cable-stayed bridge in Korea and ranked the 5th longest in the world with the main span of 800m. It is not only accumulated technological capabilities and know-how through the construction of the cable-stayed bridge, but also manages to leave behind numerous historical footsteps including the technologies in cable supported bridges, format of the execution, design, construction, and maintenance of the project. The design is executed in the format of limit state design(LSD). It is challenging to complete the maritime bridge with length of more than 10km within 5 years. However, manufacturing and installing the structures through automated manufacturing processes for the majority of the processes including the application of FSLM construction executed in Korea for the first time shorten the construction period and to overcome the differences in the tides.
- Engineering Consultant
- Seoyoung Engineering
- Address
- 246, Hwangsaeul-ro, Bundang-gu, Seongnam-si, Gyeonggi-do 13595, Korea
- Introduction
- Since the company was established in 1991, Seoyoung has been successfully providing consulting services for key infrastructure projects on highways, transportation, geotechnical, tunnels, bridges, railways, urban planning, land development, landscape architecture, environment, water resources, and harbors.
- Website
- http://www.seoyoungeng.com/html/
- -