Incheon Bridge

Incheon, Korea

Main features used in Incheon Bridge
  • Construction stage analysis with time-dependent effects
  • Cable tension optimization with geometric nonlinearity
  • Moving load analysis with concurrent member forces
Project Information
Owner
Incheon Bridge Corporation
General Contractor
Samsung Engineering & Construction
Architect
-
Engineering Consultant
Seoyoung Engineering / Chodai
Construction Period
2005 - 2009
Type of Project
Cable-stayed Bridge
Size of Structure
800m Main Span, 11.6km Total Length
Location
Incheon, Korea
Used Product
MIDAS CIVIL
  • Result
  • Panorama

ncheon Bridge is the longest cable-stayed bridge in Korea and ranked the 5th longest in the world with the main span of 800m. It is not only accumulated technological capabilities and know-how through the construction of the cable-stayed bridge, but also manages to leave behind numerous historical footsteps including the technologies in cable supported bridges, format of the execution, design, construction, and maintenance of the project. The design is executed in the format of limit state design(LSD). It is challenging to complete the maritime bridge with length of more than 10km within 5 years. However, manufacturing and installing the structures through automated manufacturing processes for the majority of the processes including the application of FSLM construction executed in Korea for the first time shorten the construction period and to overcome the differences in the tides.

Project Contact
Engineering Consultant
Seoyoung Engineering
Address
246, Hwangsaeul-ro, Bundang-gu, Seongnam-si, Gyeonggi-do 13595, Korea
Introduction
Since the company was established in 1991, Seoyoung has been successfully providing consulting services for key infrastructure projects on highways, transportation, geotechnical, tunnels, bridges, railways, urban planning, land development, landscape architecture, environment, water resources, and harbors.
Website
http://www.seoyoungeng.com/html/
Email
-