Main features used in Lee Roy Selmon Flyovers
- Construction stage analysis with post-tensioning
- Moving load analysis with concurrent member forces
Project Information
- Owner
- Tampa-Hillsborough Expressway Authority
- General Contractor
- WSP | Parsons Brinckerhoff
- Engineering Consultant
- WSP | Parsons Brinckerhoff
- Construction Period
- 2010 - 2014
- Type of Project
- PSC Box Girder Bridge
- Size of Structure
- 2.5Km Total Length
- Location
- Florida, USA
- Used Product
- MIDAS CIVIL
- Result
- Construction
- Panorama
- Key Part
The project involves reconstruction and widening of I-4 from the existing six-lane divided
interstate to a ten-lane divided interstate. The concept design proposes the addition of two new
barrier-separated express lanes in each direction for a total of ten lanes. The project also includes
reconstruction of several interchanges and arterial roads at those interchanges in order to relieve
the traffic that backs up all the way to the interchanges.
Project Contact
- Engineering Consultant
- WSP | Parsons Brinckerhoff
- Address
- 2202 N West Shore Blvd, Suite 300, Tampa, Florida 33607, USA
- Introduction
- Parsons Brinckerhoff is one of the world's leading engineering professionalconsulting firms. Their expertise ranges from environmental remediation to urbanplanning, from engineering iconic buildings to designing sustainable transportnetworks, and from developing the energy sources of the future.
- Website
- https://www.wsp-pb.com
- -