Main features used in Liede Bridge
- Steel box composite girder
- Elastic catenary cable element
- Moving load analysis
- Temperature load analysis
Project Information
- Owner
- -
- General Contractor
- -
- Engineering Consultant
- Sichuan Southwest Jiaotong University Civil Engineering Design Co., Ltd.
- Construction Period
- Completed in 2009
- Type of Project
- Self-anchored Suspension Bridge
- Size of Structure
- 219m Main Span, 4.3km Total Length
- Location
- Guangzhou, China
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Panorama
Liede Bridge opened in 2009 is a bridge crossing over the Pearl River in Guangzhou, Guangdong, China. It’s a single tower self-anchored suspension bridge structure to rewrite the history of Guangzhou without a suspension bridge. The total length is 4.3km and its single tower two span 219 + 167m main span.
Project Contact
- Engineering Consultant
- Sichuan Southwest Jiaotong University Civil Engineering Design Co., Ltd.
- Address
- No. 111, Southwest Jiaotong University Innovation Building, 18,19,20, Second Ring Road, Chengdu Jinniu District, China
- Introduction
- The firm was established in 1992. It’s the first school that opened civil engineering. Training of well-known bridge experts Mao Yisheng, Mr. Zhang Tongyan prestige, phenology experts Zhu Kezhen and the Chinese Academy of Sciences, Academy of Engineering more than 50 people in the long-span bridge research has always been a leading position in the country.
- Website
- https://www.jdtm.com.cn
- -