Would you like to sign out?

    Architecture Mistecka Junction

    Ostrava, Czech Republic

    Main features used in Mistecka Junction
    • Construction stage analysis with post tensioning concrete, creep and shrinkage
    • Moving load analysis
    Project Information
    Owner
    -
    General Contractor
    -
    Architect
    -
    Engineering Consultant
    Strasky, Husty and Partners
    Construction Period
    Completed in 2007
    Type of Project
    PSC Box Girder Bridge
    Size of Structure
    27m Main Span
    Location
    Ostrava, Czech Republic
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Construction
    • Key Part

    The junction Místecka required construction of four new bridges with length from 115m to 239m and widths from 9m to 22m.

    The bridges No. 223 and 225, which have turned off ramps, are formed with two girders mutually connected by the deck slab of variable width.

    At those points where they bifurcate, the bridges become one-girder structure with large overhangs.

    The span length are from 16m to 27m.

    Project Contact
    Engineering Consultant
    Strasky, Husty and Partners
    Address
    Sumavska 524/31, 602 00 Brno, Czech Republic
    Introduction
    It assists clients in the design and construction of a wide range of bridge and motorway structures, from pedestrian bridges to multi-lane long-span structures, and unique or special designs for landmark structures. Their experience includes cable-suspension and cable-stayed bridges, precast and cast-in-place segmental concrete and arch bridges.
    Website
    https://www.shp.eu
    Email
    shp@shp.eu