Main features used in Nanjing Eye Footbridge
- Linear dynamic analysis with response spectrum
- Unknown load factor and lack of fit force for cable optimization
Project Information
- Owner
- -
- General Contractor
- Nanjing Public Engineering Construction Center
- Engineering Consultant
- CCCC Second Harbor Engineering Company
- Construction Period
- 2013 - 2014
- Type of Project
- Cable-stayed Bridge
- Size of Structure
- 240m Main Span, 828m Total Length
- Location
- Nanjing, China
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Construction
Located at the axis of The Youth Olympic Games in Nanjing Hexi New Town, Nanjing Eye is the
first sightseeing footbridge across the Yangtze River. It is a double tower and double plane cablestayed bridge with steel-box girder, connecting two parks in Hexi and Jiangxinzhou Islet. It has
been a new landmark and tourist attraction since it has been completed
Project Contact
- Engineering Consultant
- CCCC Second Harbor Engineering Company
- Address
- No.85 Deshengmenwai Street, Xicheng District, Beijing 100088, China
- Introduction
- The firm is the largest port construction and design company in China and leads in road, railway and bridge construction and design areas. In additionally, it covers the following fields: transportation, tunnel, civil work design and construction, container crane, heavy marine machinery, large steel structure and road machinery manufacturing, and international project contracting, import and export trading services.
- Website
- https://en.ccccltd.cn
- webmaster@ccccltd.cn