Would you like to sign out?

    Nga Tu So Flyover Bridge

    Hanoi, Vietnam

    Main features used in Nga Tu So Flyover Bridge
    • Construction stage analysis with time-dependent effects
    • Response spectrum & eigenvalue analysis
    • Vehicle load optimization
    Project Information
    Owner
    Major Projects Management Unit for UrbanDevelopment of Hanoi (MPMU)
    General Contractor
    -
    Architect
    -
    Engineering Consultant
    VINACONEX E&C
    Construction Period
    2002 - 2006
    Type of Project
    Extradosed Bridge
    Size of Structure
    237m Total Length
    Location
    Hanoi, Vietnam
    Used Product
    MIDAS CIVIL
    • Result
    • Panorama

    Nga Tu So Flyover is the first extradosed cable-stayed flyover designed and executed in Vietnam. It has a width of 17.5m designed for 4 lanes. Pre-stressed reinforcement concrete girders cast in place and include 9 spans. The abutments and piers of the flyover are constructed on a bored pile foundation including 76 piles.

    Project Contact
    Engineering Consultant
    Vinaconex E&C
    Address
    No.34 Lang Ha Street, Dong Da Dist, Hanoi City, Vietnam
    Introduction
    Vinaconex E&C is a general construction company and offers a broad rangeof services in project management, procurement, construction and technologytransfer to assist clients in all phases of development – from pre-constructionto occupancy. They are now serving both public and private sector clients inconstruction investment projects of all sizes.
    Website
    https://vinaconexec.com
    Email
    vinaconexec@vinaconexec.com.vn