Main features used in Nga Tu So Flyover Bridge
- Construction stage analysis with time-dependent effects
- Response spectrum & eigenvalue analysis
- Vehicle load optimization
Project Information
- Owner
- Major Projects Management Unit for UrbanDevelopment of Hanoi (MPMU)
- General Contractor
- -
- Engineering Consultant
- VINACONEX E&C
- Construction Period
- 2002 - 2006
- Type of Project
- Extradosed Bridge
- Size of Structure
- 237m Total Length
- Location
- Hanoi, Vietnam
- Used Product
- MIDAS CIVIL
- Result
- Panorama
Nga Tu So Flyover is the first extradosed cable-stayed flyover designed and executed in Vietnam. It has a width of 17.5m designed for 4 lanes. Pre-stressed reinforcement concrete girders cast in place and include 9 spans. The abutments and piers of the flyover are constructed on a bored pile foundation including 76 piles.
Project Contact
- Engineering Consultant
- Vinaconex E&C
- Address
- No.34 Lang Ha Street, Dong Da Dist, Hanoi City, Vietnam
- Introduction
- Vinaconex E&C is a general construction company and offers a broad rangeof services in project management, procurement, construction and technologytransfer to assist clients in all phases of development – from pre-constructionto occupancy. They are now serving both public and private sector clients inconstruction investment projects of all sizes.
- Website
- https://vinaconexec.com
- vinaconexec@vinaconexec.com.vn