Main features used in Nitra Bridge
- Construction stage analysis with post tensioning concrete, creep and shrinkage
- Vehicle load optimization
Project Information
- Owner
- -
- General Contractor
- -
- Engineering Consultant
- Strasky, Husty and Partners
- Construction Period
- Completed in 2011
- Type of Project
- PSC Box Girder Bridge
- Size of Structure
- 85m Main Span, 1.16km Total Length
- Location
- Banska Bystrica, Slovakia
- Used Product
- MIDAS CIVIL
- Modeling
- Construction
- Panorama
The bridge with the total length of 1,164m is formed by 357.5m long main bridge across the
River Nitra and the 806.5m long approach viaduct. The main bridge has 5 spans of length from
50 to 85m. The decks of three-cell box section are casted segment-by-segment in symmetrical
cantilevers. The viaduct is formed by twin bridges of one-cell box section. The bridge with spans
from 28 to 45m was incrementally launched.
Project Contact
- Engineering Consultant
- Strasky, Husty and Partners
- Address
- Sumavska 524/31, 602 00 Brno, Czech Republic
- Introduction
- It assists clients in the design and construction of a wide range of bridgeand motorway structures, from pedestrian bridges to multi-lane long-spanstructures, and unique or special designs for landmark structures. Theirexperience includes cable-suspension and cable-stayed bridges, precast andcast-in-place segmental concrete and arch bridges.
- Website
- https://www.shp.eu
- shp@shp.eu