Would you like to sign out?
Nitra Bridge

Banska Bystrica, Slovakia

Main features used in Nitra Bridge
  • Construction stage analysis with post tensioning concrete, creep and shrinkage
  • Vehicle load optimization
Project Information
Owner
-
General Contractor
-
Architect
-
Engineering Consultant
Strasky, Husty and Partners
Construction Period
Completed in 2011
Type of Project
PSC Box Girder Bridge
Size of Structure
85m Main Span, 1.16km Total Length
Location
Banska Bystrica, Slovakia
Used Product
MIDAS CIVIL
  • Modeling
  • Construction
  • Panorama

The bridge with the total length of 1,164m is formed by 357.5m long main bridge across the
River Nitra and the 806.5m long approach viaduct. The main bridge has 5 spans of length from
50 to 85m. The decks of three-cell box section are casted segment-by-segment in symmetrical
cantilevers. The viaduct is formed by twin bridges of one-cell box section. The bridge with spans
from 28 to 45m was incrementally launched.

Project Contact
Engineering Consultant
Strasky, Husty and Partners
Address
Sumavska 524/31, 602 00 Brno, Czech Republic
Introduction
It assists clients in the design and construction of a wide range of bridgeand motorway structures, from pedestrian bridges to multi-lane long-spanstructures, and unique or special designs for landmark structures. Theirexperience includes cable-suspension and cable-stayed bridges, precast andcast-in-place segmental concrete and arch bridges.
Website
https://www.shp.eu
Email
shp@shp.eu