Main features used in Nowolazurowa Flyover
- DFX import
- Construction stage analysis with composite section
- Section property calculator for general shape composite section generation
- Moving load analysis
Project Information
- Owner
- Road Investments Management Authority in Warsaw
- General Contractor
- SKANSKA
- Engineering Consultant
- SKANSKA
- Construction Period
- 2014 - 2015
- Type of Project
- Steel Composite Girder Bridge
- Size of Structure
- 34m Main Span, 420m Total Length
- Location
- Warsaw, Poland
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Panorama
The cross section consists of six rolled section 1.09m high, which are made of S460 steel. The
beams are connected with 22cm (C30/37) concrete slabs. The viaduct consists of 13 spans, 28m
and 34m long. There is an expansion join on every pier, so finally it has 3 separate superstructures:
4 spans, 6 spans and 4 spans.
Project Contact
- Engineering Consultant
- SKANSKA
- Address
- Ul. Pruszkowska 17, 02-119 Warszawa, Poland
- Introduction
- SKANSKA is the largest construction company in Poland. Also, they build facilities for the largest companies in the automotive, pharmaceutical, furniture, commercial and public investors and the army. At the same time with the same commitment, they have smaller investments, building municipal and county roads, schools and kindergartens.
- Website
- https://www.skanska.pl
- -