Would you like to sign out?
Pearl Harbor Memorial Bridge (Q Bridge)

Connecticut, USA

Main features used in Pearl Harbor Memorial Bridge (Q Bridge)
  • Construction stage analysis with creep and shrinkage
  • Unknown load factor and lack of fit force for cable optimization
  • Longitudinal & transverse post-tensioning
  • Moving Load Analysis
Project Information
Owner
Connecticut Department of Transportation (CTDOT)
General Contractor
O&G Industries / The Middlesex Companies
Architect
-
Engineering Consultant
AECOM
Construction Period
2014 - 2016
Type of Project
Extradosed Bridge
Size of Structure
157m Main Span, 308m Total Length
Location
Connecticut, USA
Used Product
MIDAS CIVIL
  • Modeling
  • Result
  • Construction
  • Panorama

The existing bridge was a plate steel girder, opened in January 1958. Its main span was 118m which was the longest plate girder in Western Hemisphere. For the replacement of the old bridge, several alternative studies were carried out and a concrete extradosed bridge was selected. Midas software was used for transverse review of the new bridge with the 3D model using solid elements.

Project Contact
Engineering Consultant
AECOM
Address
650 W Courtney Campbell Causeway, Tampa, FL 33607, USA
Introduction
AECOM provides professional technical and management support services to both public and private sector clients. Services relate to Architecture & Design, Construction, Cost Management, Decommissioning & Closure, Economics, Engineering, Environmental Services, Planning & Consulting, Program, Technical Services, etc.
Website
https://www.aecom.com
Email
-