    Pearl Harbor Memorial Bridge (Q Bridge)

    Connecticut, USA

    Main features used in Pearl Harbor Memorial Bridge (Q Bridge)
    • Construction stage analysis with creep and shrinkage
    • Unknown load factor and lack of fit force for cable optimization
    • Longitudinal & transverse post-tensioning
    • Moving Load Analysis
    Project Information
    Owner
    Connecticut Department of Transportation (CTDOT)
    General Contractor
    O&G Industries / The Middlesex Companies
    Architect
    -
    Engineering Consultant
    AECOM
    Construction Period
    2014 - 2016
    Type of Project
    Extradosed Bridge
    Size of Structure
    157m Main Span, 308m Total Length
    Location
    Connecticut, USA
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Construction
    • Panorama

    The existing bridge was a plate steel girder, opened in January 1958. Its main span was 118m which was the longest plate girder in Western Hemisphere. For the replacement of the old bridge, several alternative studies were carried out and a concrete extradosed bridge was selected. Midas software was used for transverse review of the new bridge with the 3D model using solid elements.

    Project Contact
    Engineering Consultant
    AECOM
    Address
    650 W Courtney Campbell Causeway, Tampa, FL 33607, USA
    Introduction
    AECOM provides professional technical and management support services to both public and private sector clients. Services relate to Architecture & Design, Construction, Cost Management, Decommissioning & Closure, Economics, Engineering, Environmental Services, Planning & Consulting, Program, Technical Services, etc.
    Website
    https://www.aecom.com
    Email
    -