Main features used in Pearl Harbor Memorial Bridge (Q Bridge)
- Construction stage analysis with creep and shrinkage
- Unknown load factor and lack of fit force for cable optimization
- Longitudinal & transverse post-tensioning
- Moving Load Analysis
Project Information
- Owner
- Connecticut Department of Transportation (CTDOT)
- General Contractor
- O&G Industries / The Middlesex Companies
- Engineering Consultant
- AECOM
- Construction Period
- 2014 - 2016
- Type of Project
- Extradosed Bridge
- Size of Structure
- 157m Main Span, 308m Total Length
- Location
- Connecticut, USA
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Construction
- Panorama
The existing bridge was a plate steel girder, opened in January 1958. Its main span was 118m which was the longest plate girder in Western Hemisphere. For the replacement of the old bridge, several alternative studies were carried out and a concrete extradosed bridge was selected. Midas software was used for transverse review of the new bridge with the 3D model using solid elements.
Project Contact
- Engineering Consultant
- AECOM
- Address
- 650 W Courtney Campbell Causeway, Tampa, FL 33607, USA
- Introduction
- AECOM provides professional technical and management support services to both public and private sector clients. Services relate to Architecture & Design, Construction, Cost Management, Decommissioning & Closure, Economics, Engineering, Environmental Services, Planning & Consulting, Program, Technical Services, etc.
- Website
- https://www.aecom.com
- -