Would you like to sign out?

    Portishead Skew Bridge

    Bristol, UK

    Main features used in Portishead Skew Bridge
    • Construction stage analysis with composite action
    • Moving load analysis
    Project Information
    Owner
    -
    General Contractor
    -
    Architect
    -
    Engineering Consultant
    WSP | Parsons Brinckerhoff
    Construction Period
    2015 - 2016
    Type of Project
    Steel Composite Girder Bridge
    Size of Structure
    815m Total Length
    Location
    Bristol, UK
    Used Product
    MIDAS CIVIL
    • Sketch
    • Modeling
    • Result

    The bridge consists of five-span continuous steel and reinforced concrete composite girders, with
    a reinforced concrete substructure and piled foundations. It will carry the AVTM Metro bus route
    over the Portishead Branch railway, Ashton Vale road and Ashton Vale culvert in Bristol city.

    Project Contact
    Engineering Consultant
    WSP | Parsons Brinckerhoff
    Address
    Kings Orchard 1 Queen Street Bristol Avon BS2 0HQ, UK
    Introduction
    Parsons Brinckerhoff is one of the world's leading engineering professional consulting firms. Their expertise ranges from environmental remediation to urban planning, from engineering iconic buildings to designing sustainable transport networks, and from developing the energy sources of the future.
    Website
    https://www.wsp-pb.com
    Email
    -