Main features used in Portishead Skew Bridge
- Construction stage analysis with composite action
- Moving load analysis
Project Information
- Owner
- -
- General Contractor
- -
- Engineering Consultant
- WSP | Parsons Brinckerhoff
- Construction Period
- 2015 - 2016
- Type of Project
- Steel Composite Girder Bridge
- Size of Structure
- 815m Total Length
- Location
- Bristol, UK
- Used Product
- MIDAS CIVIL
- Sketch
- Modeling
- Result
The bridge consists of five-span continuous steel and reinforced concrete composite girders, with
a reinforced concrete substructure and piled foundations. It will carry the AVTM Metro bus route
over the Portishead Branch railway, Ashton Vale road and Ashton Vale culvert in Bristol city.
Project Contact
- Engineering Consultant
- WSP | Parsons Brinckerhoff
- Address
- Kings Orchard 1 Queen Street Bristol Avon BS2 0HQ, UK
- Introduction
- Parsons Brinckerhoff is one of the world's leading engineering professional consulting firms. Their expertise ranges from environmental remediation to urban planning, from engineering iconic buildings to designing sustainable transport networks, and from developing the energy sources of the future.
- Website
- https://www.wsp-pb.com
- -