Main features used in Povazska Bystrica Bridge
- Unknown load factor and lack of fit force for cable optimization
- Construction stage analysis
- Moving load analysis
Project Information
- Owner
- -
- General Contractor
- -
- Engineering Consultant
- Strasky, Husty and Partners
- Construction Period
- Completed in 2010
- Type of Project
- Extradosed Bridge
- Size of Structure
- 122m Main Span, 872m Total Length
- Location
- Povazska Bystrica, Slovakia
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Panorama
The bridge, total length of 872m and span length of 68 + 6 x 122 + 68m, is formed by one cell box girders with large overhangs supported by the precast structure. The bridge is being casted in symmetrical cantilevers starting at piers.
Project Contact
- Engineering Consultant
- Strasky, Husty and Partners
- Address
- Sumavska 524/31, 602 00 Brno, Czech Republic
- Introduction
- It assists clients in the design and construction of a wide range of bridge andmotorway structures, from pedestrian bridges to multi-lane long-span structures,and unique or special designs for landmark structures. Their experience includescable-suspension and cable-stayed bridges, precast and cast-in-place segmentalconcrete and arch bridges.
- Website
- https://www.shp.eu
- shp@shp.eu