Main features used in River Devon Viaduct
- Construction stage analysis
- Moving load analysis
- Buckling analysis with finite elements
- Steel composite design as per Eurocode
Project Information
- Owner
- Urban and Civic
- General Contractor
- -
- Engineering Consultant
- WSP | Parsons Brinckerhoff
- Construction Period
- Completed in 2017
- Type of Project
- Steel Composite Integral Bridge
- Size of Structure
- 100m Main Span
- Location
- Edinburgh, Scotland
- Used Product
- MIDAS CIVIL
- Modeling
- Result
The proposed structure is a three-span bridge carrying the Newark Southern Link Road across the River Devon, at a skew of 35°. The overall length of the bridge (combined effective span of 100m) exceeds 60m so the bridge will be of conventional (non-integral) construction.
Project Contact
- Engineering Consultant
- WSP | Parsons Brinckerhoff
- Address
- Kings Orchard 1 Queen Street Bristol Avon BS2 0HQ, UK
- Introduction
- Parsons Brinckerhoff is one of the world's leading engineering professional consulting firms. Their expertise ranges from environmental remediation to urban planning, from engineering iconic buildings to designing sustainable transport networks, and from developing the energy sources of the future.
- Website
- https://www.wsp-pb.com
- -