Main features used in Russky Island Bridge
- Unknown load factor and lack of fit force for cable optimization
- Construction stage analysis with composite action
- Moving load analysis
Project Information
- Owner
- Russian Federal Road Agency-Directorate for Construction of Road Facilities in Vladivostok
- General Contractor
- SK Most / Mostovik
- Engineering Consultant
- Mostovik
- Construction Period
- 2009 - 2012
- Type of Project
- Cable-stayed Bridge
- Size of Structure
- 1.1km Main Span, 3.1km Total Length
- Location
- Vladivostok, Russia
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Panorama
The bridge to the Russky Island is one of the world’s largest cable-stayed bridges with the 1,104m long of the central span and it establishes a new record of bridge building practice in the world. The bridge also has the highest bridge towers and the longest stayed cables.
Project Contact
- Engineering Consultant
- Mostovik
- Address
- Mira prospekt 5 Omsk, 644080, Russia
- Introduction
- NPO Mostovik offers construction contract services which includes construction of roads and bridges. Also, it was founded in 1982 and is based in Omsk, Russia. As of 2016, it is in reorganization.
- Website
- https://mostovik.com/
- most@mirmostov.ru