Would you like to sign out?

    Skrecon Bridge

    Bohumin, Czech Republic

    Main features used in Skrecon Bridge
    • Unknown load factor and lack of fit force for cable optimization
    • Construction stage analysis
    • Moving load analysis
    • Detail analysis with finite elements
    Project Information
    Owner
    -
    General Contractor
    -
    Architect
    -
    Engineering Consultant
    Bohumin, Czech Republic
    Construction Period
    2009 - 2011
    Type of Project
    Cable-stayed Bridge
    Size of Structure
    70m Main Span, 140m Total Length
    Location
    Bohumin, Czech Republic
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Construction
    • Panorama

    The bridge with a total length of 140.3m has three spans with length of 30 + 70 + 30m. The deck, which is formed by a two-edge girder mutually connected by floor beams and a composite deck slabs, is suspended from two pylons.

    Project Contact
    Engineering Consultant
    Strasky, Husty and Partners
    Address
    Sumavska 524/31, 602 00 Brno, Czech Republic
    Introduction
    It assists clients in the design and construction of a wide range of bridge and motorway structures, from pedestrian bridges to multi-lane long-span structures, and unique or special designs for landmark structures. Their experience includes cable-suspension and cable-stayed bridges, precast and cast-in-place segmental concrete and arch bridges.
    Website
    https://www.shp.eu
    Email
    shp@shp.eu