Main features used in Skrecon Bridge
- Unknown load factor and lack of fit force for cable optimization
- Construction stage analysis
- Moving load analysis
- Detail analysis with finite elements
Project Information
- Owner
- -
- General Contractor
- -
- Engineering Consultant
- Bohumin, Czech Republic
- Construction Period
- 2009 - 2011
- Type of Project
- Cable-stayed Bridge
- Size of Structure
- 70m Main Span, 140m Total Length
- Location
- Bohumin, Czech Republic
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Construction
- Panorama
The bridge with a total length of 140.3m has three spans with length of 30 + 70 + 30m. The deck, which is formed by a two-edge girder mutually connected by floor beams and a composite deck slabs, is suspended from two pylons.
Project Contact
- Engineering Consultant
- Strasky, Husty and Partners
- Address
- Sumavska 524/31, 602 00 Brno, Czech Republic
- Introduction
- It assists clients in the design and construction of a wide range of bridge and motorway structures, from pedestrian bridges to multi-lane long-span structures, and unique or special designs for landmark structures. Their experience includes cable-suspension and cable-stayed bridges, precast and cast-in-place segmental concrete and arch bridges.
- Website
- https://www.shp.eu
- shp@shp.eu