Would you like to sign out?

    Architecture Tapi Cable-stayed Bridge

    Surat, India

    Main features used in Tapi Cable-stayed Bridge
    • Unknown load factor and lack of fit force for cable optimization
    • Cable Force Tuning
    • Construction stage analysis with post-tensioning
    Project Information
    Owner
    Surat Municipal Corporation
    General Contractor
    Gammon India
    Architect
    -
    Engineering Consultant
    S.N. Bhobe & Associates
    Construction Period
    Under Construction
    Type of Project
    Cable-stayed Bridge
    Size of Structure
    918m Total Length
    Location
    Surat, India
    Used Product
    MIDAS CIVIL
    • Panorama

    In Surat, the ambitious Rs 143-crore project involves the construction of the 918m long cable-stayed bridge over River Tapi.

    The construction of the cable-stayed bridge, which connects Athwalines to Pal, is scheduled for completion in December 2017.

    Project Contact
    Engineering Consultant
    S.N. Bhobe & Associates
    Address
    4th Floor, Pudhari Bhavan, Plot No. 29-32, 36 & 37, Sector - 30A, Near Sanpada Railway Station, Vashi, Navi Mumbai, 400 705, India
    Introduction
    S.N. Bhobe& Associates is one of the oldest civil engineering consulting firms in India. They provide services in bridge design, structural engineering & architecture and planning.
    Website
    https://www.snbapl.com
    Email
    info@snbapl.com