Main features used in Tapi Cable-stayed Bridge
- Unknown load factor and lack of fit force for cable optimization
- Cable Force Tuning
- Construction stage analysis with post-tensioning
Project Information
- Owner
- Surat Municipal Corporation
- General Contractor
- Gammon India
- Engineering Consultant
- S.N. Bhobe & Associates
- Construction Period
- Under Construction
- Type of Project
- Cable-stayed Bridge
- Size of Structure
- 918m Total Length
- Location
- Surat, India
- Used Product
- MIDAS CIVIL
- Panorama
In Surat, the ambitious Rs 143-crore project involves the construction of the 918m long cable-stayed bridge over River Tapi.
The construction of the cable-stayed bridge, which connects Athwalines to Pal, is scheduled for completion in December 2017.
Project Contact
- Engineering Consultant
- S.N. Bhobe & Associates
- Address
- 4th Floor, Pudhari Bhavan, Plot No. 29-32, 36 & 37, Sector - 30A, Near Sanpada Railway Station, Vashi, Navi Mumbai, 400 705, India
- Introduction
- S.N. Bhobe& Associates is one of the oldest civil engineering consulting firms in India. They provide services in bridge design, structural engineering & architecture and planning.
- Website
- https://www.snbapl.com
- info@snbapl.com