    Temburong CC3 Bridge

    Muara, Brunei

    Main features used in Temburong CC3 Bridge
    • Unknown load factor and lack of fit force for cable optimization
    • Construction stage analysis with composite action
    • Moving load analysis
    Project Information
    Owner
    Jabatan Kerja Raya (Public Works Department of Brunei)
    General Contractor
    SK Most / Mostovik
    Architect
    -
    Engineering Consultant
    Mostovik
    Construction Period
    2009 - 2012
    Type of Project
    Cable-stayed Bridge
    Size of Structure
    1.1km Main Span, 3.1km Total Length
    Location
    Muara, Brunei
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Panorama

    The bridge to the Russky Island is one of the world’s largest cable-stayed bridges with the 1,104m long of the central span and it establishes a new record of bridge building practice in the world. The bridge also has the highest bridge towers and the longest stayed cables.

    Project Contact
    Engineering Consultant
    DAELIM
    Address
    146-12 Susong-dong, Jongro-gu, 03152, Seoul, Korea
    Introduction
    Daelim Industrial was established in 1939. The fields covered by Daelim Industrial as one of the top EPC Company in Asia to the Middle East include gas, petroleum refining, chemical and petrochemical, power and energy plants, building and housing, civil works, and industrial facilities.
    Website
    https://www.daelim.co.kr
    Email
    -