Main features used in Temburong CC3 Bridge
- Unknown load factor and lack of fit force for cable optimization
- Construction stage analysis with composite action
- Moving load analysis
Project Information
- Owner
- Jabatan Kerja Raya (Public Works Department of Brunei)
- General Contractor
- SK Most / Mostovik
- Engineering Consultant
- Mostovik
- Construction Period
- 2009 - 2012
- Type of Project
- Cable-stayed Bridge
- Size of Structure
- 1.1km Main Span, 3.1km Total Length
- Location
- Muara, Brunei
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Panorama
The bridge to the Russky Island is one of the world’s largest cable-stayed bridges with the 1,104m long of the central span and it establishes a new record of bridge building practice in the world. The bridge also has the highest bridge towers and the longest stayed cables.
Project Contact
- Engineering Consultant
- DAELIM
- Address
- 146-12 Susong-dong, Jongro-gu, 03152, Seoul, Korea
- Introduction
- Daelim Industrial was established in 1939. The fields covered by Daelim Industrial as one of the top EPC Company in Asia to the Middle East include gas, petroleum refining, chemical and petrochemical, power and energy plants, building and housing, civil works, and industrial facilities.
- Website
- https://www.daelim.co.kr
- -