Would you like to sign out?

    The Basarab Overpass

    Bucharest, Romania

    Main features used in The Basarab Overpass
    • Linear static and nonlinear dynamic analysis
    • Time history analysis using lead rubber bearings isolators(LRB) and viscous dampers
    Project Information
    Owner
    -
    General Contractor
    JOINT VENTURE ASTALDI
    Architect
    -
    Engineering Consultant
    C&T Engineering
    Construction Period
    2007 – 2010
    Type of Project
    PSC Box Girder Bridge
    Size of Structure
    125m Main Span, 1.5km Total Length
    Location
    Bucharest, Romania
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Construction

    The flyover connects the railway central station with the Grozavesti Bulevardul, beyond the Dambovita River in Bucharest downtown. The project is 1,478m long (including the begin/end ramps) and consists of an arch bridge over the Dambovita River (span 125m), a complex road/ tramway viaduct 791m long, a cable-stayed bridge 302m long and 40m wide over the railway tracks. The new link is completed by three side ramps connecting the flyover with secondary roads.

    Project Contact
    Engineering Consultant
    C&T Engineering
    Address
    via veneto 13, 31057 Lanzago di Silea TV, Italy
    Introduction
    It is a service company operating in the field of civil engineering founded inAugust 1994 by the founding partners, ing. Francesco Toninato and ing. RuggeroCervellini.
    Website
    https://www.cetengineering.it
    Email
    info@cetengineering.it