Main features used in The Basarab Overpass
- Linear static and nonlinear dynamic analysis
- Time history analysis using lead rubber bearings isolators(LRB) and viscous dampers
Project Information
- Owner
- -
- General Contractor
- JOINT VENTURE ASTALDI
- Engineering Consultant
- C&T Engineering
- Construction Period
- 2007 – 2010
- Type of Project
- PSC Box Girder Bridge
- Size of Structure
- 125m Main Span, 1.5km Total Length
- Location
- Bucharest, Romania
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Construction
The flyover connects the railway central station with the Grozavesti Bulevardul, beyond the Dambovita River in Bucharest downtown. The project is 1,478m long (including the begin/end ramps) and consists of an arch bridge over the Dambovita River (span 125m), a complex road/ tramway viaduct 791m long, a cable-stayed bridge 302m long and 40m wide over the railway tracks. The new link is completed by three side ramps connecting the flyover with secondary roads.
Project Contact
- Engineering Consultant
- C&T Engineering
- Address
- via veneto 13, 31057 Lanzago di Silea TV, Italy
- Introduction
- It is a service company operating in the field of civil engineering founded inAugust 1994 by the founding partners, ing. Francesco Toninato and ing. RuggeroCervellini.
- Website
- https://www.cetengineering.it
- info@cetengineering.it