Main features used in Third Orbital Expressway
- Construction stage analysis with post-tensioning
- Settlement analysis
- Moving load analysis with concurrent member forces
Project Information
- Owner
- Public Works Authority, Qatar
- General Contractor
- -
- Engineering Consultant
- Mott Macdonald
- Construction Period
- Under Construction
- Type of Project
- PSC Box Girder Bridge
- Size of Structure
- 56km Total Length
- Location
- Doha, Qatar
- Used Product
- MIDAS CIVIL
- Modeling
- Result
- Drawing/Report
This urban infrastructure is within the contract of the New Orbital Highway and Truck Route
in Doha, Qatar. It connects the Mesaieed industrial area and New Port Projects to Salwa Road
including a total of approximately 56km of road works. The new junction bridges are posttensioned
segmental box girders erected using the span-by-span method. Staged construction
and seismic analysis have been included.
Project Contact
- Engineering Consultant
- Mott Macdonald
- Address
- Mott MacDonald House 8-10 Sydenham Road, Croydon, CR0 2EE, UK
- Introduction
- The Mott MacDonald Group is a multidisciplinary consultancy with headquartersin the United Kingdom. It provides engineering, management and developmentservices internationally, with 16,000 staff in 150 countries.
- Website
- https://www.mottmac.com
- marketing@mottmac.com