    Architecture Tulur Aji Jejangkat Bridge

    West Kutai, Indonesia

    Main features used in Tulur Aji Jejangkat Bridge
    • Stress check & stayed-cable force
    • Construction stage analysis
    • Hinge properties for pushover analysis
    Project Information
    Owner
    Indonesia Ministry of Public Works
    General Contractor
    Waskita Karya
    Architect
    -
    Engineering Consultant
    Partono Fondas Engineering Consultant
    Construction Period
    2008 – 2014
    Type of Project
    Cable-stayed Bridge
    Size of Structure
    304m Main Span, 1km Total Length
    Location
    West Kutai, Indonesia
    Used Product
    MIDAS CIVIL
    • Result

    Located near Melak & Manor Bulan city, Aji Tulur Jejangkat cable-stayed bridge is built between Western Kutai and Kutai Kartanegara District, as well as Samarinda, with the total span length of 1,040m.

    Project Contact
    Engineering Consultant
    Partono Fondas Engineering Consultant
    Address
    Pusat Niaga Roxy Mas Blok C4 No.16 Jl. KH Hasyim Ashari No.125, Jakarta Pusat 10150, Indonesia
    Introduction
    Established as the structural design & engineering consultancy office for more than 27 years, PT. Partono Fondas Engineering Consultant is specialized in industrial building and bridge structure design.
    Website
    https://www.partonofondas.com
    Email
    office@partonofondas.com