    Architecture Turda Motorway Bridge

    Cluj-Napoca, Romania

    Main features used in Turda Motorway Bridge
    • RC grillage wizard
    • Moving load analysis with concurrent member forces
    • Tendon loss results
    Project Information
    Owner
    C.N.A.D.N.R. S.A.
    General Contractor
    PORR Construct
    Architect
    -
    Engineering Consultant
    INTEGRATED ROAD SOLUTIONS
    Construction Period
    2014 – 2017
    Type of Project
    Multi-cell Box Girder Bridge
    Size of Structure
    168m Main Span, 1.9km Total Length
    Location
    Cluj-Napoca, Romania
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Drawing/Report

    The project includes planning and construction of a 16.30km long motorway section.
    Within this project, 17 highway bridges of which two run over viaducts, 13 overpasses and a parking space as well as road maintenance will be built.
    A total of 13 overpasses will be built on the route.

    Project Contact
    Engineering Consultant
    INTEGRATED ROAD SOLUTIONS
    Address
    Str. Alexandru Lapusneanu, nr.20C, sector 1, Bucuresti 012867, Romania
    Introduction
    IRS was established in 2011. The company is specialized in design and technical checks of bridges, passages, and viaducts. They also provides stability and dynamism verification.
    Website
    https://www.irsol.ro
    Email
    office@irsol.ro