Would you like to sign out?
Architecture Turda Motorway Bridge

Cluj-Napoca, Romania

Main features used in Turda Motorway Bridge
  • RC grillage wizard
  • Moving load analysis with concurrent member forces
  • Tendon loss results
Project Information
Owner
C.N.A.D.N.R. S.A.
General Contractor
PORR Construct
Architect
-
Engineering Consultant
INTEGRATED ROAD SOLUTIONS
Construction Period
2014 – 2017
Type of Project
Multi-cell Box Girder Bridge
Size of Structure
168m Main Span, 1.9km Total Length
Location
Cluj-Napoca, Romania
Used Product
MIDAS CIVIL
  • Modeling
  • Result
  • Drawing/Report

The project includes planning and construction of a 16.30km long motorway section.
Within this project, 17 highway bridges of which two run over viaducts, 13 overpasses and a parking space as well as road maintenance will be built.
A total of 13 overpasses will be built on the route.

Project Contact
Engineering Consultant
INTEGRATED ROAD SOLUTIONS
Address
Str. Alexandru Lapusneanu, nr.20C, sector 1, Bucuresti 012867, Romania
Introduction
IRS was established in 2011. The company is specialized in design and technical checks of bridges, passages, and viaducts. They also provides stability and dynamism verification.
Website
https://www.irsol.ro
Email
office@irsol.ro