Would you like to sign out?

    Weirton-Steubenville Bridge

    Ohio, USA

    Main features used in Weirton-Steubenville Bridge
    • Construction stage analysis
    • Cable tension optimization
    Project Information
    Owner
    Ohio Department of Transportation
    General Contractor
    S.J. Groves & Sons
    Architect
    -
    Engineering Consultant
    T.Y. LIN INTERNATIONAL GROUP
    Construction Period
    Completed in 1989
    Type of Project
    Cable-stayed Bridge
    Size of Structure
    250m Main Span, 598m Total Length
    Location
    Ohio, USA
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Panorama

    The Weirton-Steubenville Bridge is an asymmetrical cable-stayed bridge with a single tower. The girders are I-shaped steel plate girders with a skewed web at 10˚. The 52 cables create a dual-plane system. The concrete deck is treated as a composite system. The tower is reinforced concrete with an inverted Y-shape. In addition to the 3D analysis, a detailed analysis for the anchor block has been performed.

    Project Contact
    Engineering Consultant
    T.Y. LIN INTERNATIONAL GROUP
    Address
    345 California Street, Suite 2300, San Francisco, California 94104, USA
    Introduction
    T. Y. Lin International is a global, multi-disciplinary infrastructure services firm. The firm provides a range of planning, design, construction and project management services to the aviation, bridge, facilities, planning, and management, ports and marine, rail and transit, and surface transportation industries. They operates more than 50 regional centers.
    Website
    https://www.tylin.com
    Email
    maribel.castillo@tylin.com