Would you like to sign out?

    Architecture Wujiang Bridge

    Jiangsu, China

    Main features used in Wujiang Bridge
    • Construction phase analysis
    • Moving load analysis
    • Performance evaluation
    Project Information
    Owner
    -
    General Contractor
    Guizhou Province Bridge Engineering Corporation
    Architect
    -
    Engineering Consultant
    Guizhou Provincial Transport Planning Survey and Design Institute Co., Ltd.
    Construction Period
    1995년 - 1997년
    Type of Project
    Mixed Cable-stayed Suspension Bridge
    Size of Structure
    288m Main Span, 461m Total Length
    Location
    Jiangsu, China
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result

    The main girder of the bridge is prestressed concrete continuous stiffening beam composed of 168m in the middle cable and 60m of each ends.

    Project Contact
    Engineering Consultant
    Guizhou Provincial Transportation Planning Survey and Design Institute Co., Ltd.
    Address
    Guizhou Province National Hi-Tech Industrial Development Zone Yang Guan Road, No. 100, Guiyang City, China
    Introduction
    The firm was founded in 1958. The core business is the engineering consulting and engineering contracting of the highway industry.
    Website
    https://www.gzjtsjy.com
    Email
    market@gzjtjs.com.cn