로그아웃 하시겠습니까?

    Architecture Nanjing Dashengguan ChangJiang Bridge

    Nanning, China

    Main features used in Nanjing Dashengguan ChangJiang Bridge
    • Construction stage analysis with beam and plate composite action
    • Moving load analysis with concurrent member forces
    • Bearing settlement analysis
    Project Information
    Owner
    Ministry of Railways of the People's Republic of China
    General Contractor
    -
    Architect
    -
    Engineering Consultant
    China Railway Major Bridge Reconnaissance & Design Institute
    Construction Period
    2006 - 2010
    Type of Project
    Cantilever Arch Railway Bridge
    Size of Structure
    336m Main Span, 1.6km Total Length
    Location
    Nanning, China
    Used Product
    MIDAS CIVIL
    • Modeling
    • Result
    • Panorama

    The Bridge is constructed to complement the Beijing-Shanghai High-Speed Line. The bridge is located within the Jiangsu Province, in the upper reach of the Yangtze River, about 20km from the Third Nanjing Yangtze River Bridge. The construction begins in 2006 and is finished in 2010, with the bridge becoming operational in January 2011. The Bridge bears the weight of six track live load and 920kN/m of dead load, which is one of the largest railway loading in the world. The bridge has an overall length of 1,615m, and it is designed for speeds of up to 350km/h.

    Project Contact
    Engineering Consultant
    China Railway Major Bridge Reconnaissance & Design Institute
    Address
    No.8 Boxue Road, Wuhan Economic&Technological Development Zone, P.R. China
    Introduction
    The firm was founded in 1950 as a state-owned company with more than 500 employees. It provides various engineering services including bridge surveys, investigation, engineering design, design proof checks, consultancy, structural inspections, retrofit and monitoring, construction supervision, project management and D&B project implementation.
    Website
    https://www.brdi.com.cn
    Email
    brdi@brdi.com.cn