MIDAS CIVIL Integral Bridges Soil Structure Interaction Tips & Tutorials Substructures Bridge Engineering Spring Support Field_Bridge Category_How-to Structure Type_Bridge
The Latest Engineering Trends and Issues
MIDAS CIVIL Integral Bridges Soil Structure Interaction Tips & Tutorials Substructures Bridge Engineering Spring Support Field_Bridge Category_How-to Structure Type_Bridge
MIDAS CIVIL Integral Bridges Case Study Construction Stage Analysis Composite Bridge Design Composite Steel Global Structural Analysis Grillage Deck Composite Action Field_Bridge Category_Case Study Structure Type_Bridge Design Code_Eurocode Design Code_BS
This webinar shows a bridge design carried out in 2017 for new Composite integral bridge.The B9090 White Bridge Replacement project was commissioned by The Highland Council, Designed by AECOM and constructed by RJ McLeod. The replacement bridge was commission to bypass a Category A Listed stone bridge, which was built in the early 1750. The new bridge is a 40m span integral steel/concrete composite structure designed to support the realigned B9090 over the River Nairn.
MIDAS CIVIL Bridge Design Integral Bridges Soil Structure Interaction Case Study Continuum Media Spring Analogy Retaining Structures Field_Bridge Category_Knowledge Category_Case Study Structure Type_Bridge Design Code_Eurocode
MIDAS CIVIL Integral Bridges Case Study Structural Analysis Time Dependent Material Properties Construction Stages Field_Bridge Category_Case Study Structure Type_Bridge Design Code_Eurocode
This case study covers the following aspects: