About Project
The construction is complicated by the fact that 20m deep tunnels performed open way in water saturated sands and tested at an average distance of 10m from residential buildings. In this excavation, Halabyan - Baltic tunnel under two tunnels under the existing subway and the Leningrad highway tunnel runs closed method without stopping subway and vehicle traffic.
Site location of SOKOL district
Project Name
Leningradskoye Highway
Location
Moscow, Russia
Construction Period
2007 – 2015
Contractor
NPO Cosmos
Designer
Podzemproekt LLC