    Project Stories | Construction of the two level road interchange near the metro tunnel

    About Project

    The construction is complicated by the fact that 20m deep tunnels performed open way in water saturated sands and tested at an average distance of 10m from residential buildings. In this excavation, Halabyan - Baltic tunnel under two tunnels under the existing subway and the Leningrad highway tunnel runs closed method without stopping subway and vehicle traffic.

     

    Site location of SOKOL district

    Site location of SOKOL district

     

    Project Name

    Leningradskoye Highway

    Location

    Moscow, Russia

    Construction Period

    2007 – 2015

    Contractor

    NPO Cosmos

    Designer

    Podzemproekt LLC

     

    Mesh for underground structures

    Mesh for underground structures

     

    3D mesh for construction stage analysis

    3D mesh for construction stage analysis

     

     


     

     

    👉 Relevant project 

    ▪️ Blog | 5 Common tunnel designs to consider 3D effects

    ▪️ Blog | Modelling of the joints between segments in TBM Tunnel

    👉 Click here to see the case study webinar

    tunneling_webinar

    Subscribe to Newsletter

    Catch the weekly engineer news!