    Seismic Analysis of Cable Structures, Part 2: Time History Analysis of a Cable-Supported Bridge

    Table of Contents Click the table of contents for details.

    Introduction

    During an earthquake, stay cables may experience significant gain or loss in tension. We need to perform a time-history analysis of the bridge to quantify the axial tension in the cables during a seismic event. However, these final cable forces obtained from time-history analysis depend on the permanent state of the bridge, i.e., when it is subjected to dead loads plus cable pretension.

    In MIDAS CIVIL NX, for time-history analysis, cables are modeled as equivalent truss elements, which is valid as long as the cables remain in tension. This article walks through the workflow for performing THA on a completed stage cable-stayed bridge model and compares five approaches for applying the permanent state prior to the earthquake.

     

    1. Time History Analysis Workflow

    The example uses the MIDAS CIVIL NX tutorial model
    "C:/Program Files/MIDAS/MIDAS CIVIL NX/Tutorial/10 Cable Stayed Forward Construction.mcb".
    Save the model in a different folder before you start.

    1.1 Convert the final construction stage into a static model

    Convert the last construction stage, "Stage 13", of the forward analysis model into a static analysis model. Open the file "10 Cable Stayed Forward Construction_Stage13.mcb" and save it as Model 1.mcb.

    Figure 1. File > Save Current Stage As

     

    1.2 Define the static load case ST: D+P

    Create the load combination CB: LC from the load cases active in the final stage, then define the static load case ST: D+P from it for permanent loads and pretension.

    Figure 2. Load combination CB: LC with the active load cases in the final stage

    Figure 3. Load > Static Loads > Using Load Combinations

     

    1.3 Convert cable elements into equivalent truss elements

    In Analysis > Main Control Data, convert the tension-only cable elements into equivalent truss elements.

    Figure 4. Analysis > Main Control Data

     

    1.4 Define the quasi-static TH: D+P load case

    Define a time history load case D+P with a very high modal damping of 0.999 to obtain quasi-static responses under permanent effects. This load case is the precursor to the seismic load case.

    Figure 5. Load > Dynamic Loads > Load Cases > Add (TH: D+P)

     

    1.5 Define a step function

    Define a step function with a scale factor of 1 for a duration of 10 seconds or longer than the end time of the TH: D+P load case.

    Figure 6. Load > Dynamic Loads > Time History Functions > Add Time Function

     

    1.6 Assign ST: D+P as a time-varying static load

    Assign ST: D+P as a time-varying static load to the TH: D+P load case using the step function.

    Figure 7. Load > Dynamic Loads > Time Varying Static Loads

     

    1.7 Define the seismic load case TH: Seismic

    Define an earthquake time history load case TH: Seismic, with Rayleigh damping. Under Order in Sequential Loading, set it Subsequent to Load Case TH: D+P so it acts after the permanent effects are considered.

    Check “Keep Final Step Loads Constant” to ensure the correct cable tension forces are obtained. When “Keep Final Step Loads Constant” is not considered, under the THmin: Seismic load case, a few cables incorrectly show compressive forces.

    Figure 8. Load > Dynamic Loads > Load Cases > Add (TH: Seismic)

     

    1.8 Define the earthquake time-history function

    Define a normalized acceleration time-history function for the earthquake.

    Figure 9. Load > Dynamic Loads > Time History Functions > Add Time Function > Earthquake

     

    1.9 Assign the ground acceleration

    Assign the function, Elcent_v, as ground acceleration in the vertical direction for TH: Seismic, with a scale factor of 1 and an arrival time of 0 sec.

    Figure 10. Load > Dynamic Loads > Ground Acceleration > Function for Direction Z > Add

     

      
     You can check more of these details in the download file. 

    2. Comparison of Modeling Approaches

    2.1 Modeling Approaches

    2.2 Static and Quasi-Static Cable Forces under D+P

    2.3 Model 1 and Model 2: Keep Final Step Loads Constant OFF and ON

    2.4 Model 3: Initial Element Forces (Table) as Preceding Load

    2.5 Model 4: ST: D+P as Preceding Load

    2.6 Model 5: Initial Forces for Geometric Stiffness

    2.7 Comparison of Maximum and Minimum Cable Forces

    3. Conclusion

     

    Are you curious about what comes next? Submit the form
    to view the full content.

    Download E-Book

    We are requesting some information to send the e-book.

    Author

    Anju B Sunil Technical Support Engineer MIDAS IT

    Anju provides technical support for practicing bridge engineers using MIDAS CIVIL NX and FEA NX at MIDAS IT. Previously, she worked on the design and assessment of PSC Composite Bridges and Steel Bridges for the ANZ region, contributing to Highway and Rail Bridge projects based on Australian Codes and Standards. She has experience in Bridge Design, Structural Analysis, and Load Rating Assessment across major infrastructure projects.

    Related On-Demand

    Seismic Design of Bridges under Spatially Variable Ground Motion
    #Spatially Variable Ground Motion #Eurocode #Code Update

    In this session, we will share innovative approaches to real-time data processing with geo In this session, we will share innovative approaches to real-time data processing with geo-ession, we will share innovative approaches to real-time data processing with geo-

    Subscribe to Newsletter

    Catch the weekly engineer news!

    What you may
    also like

    If you have any questions,
    feel free to reach out at any time.

    Contact Us